|
|
 |
|
| DAY 3 SATURDAY 1st NOVEMBER 2008 |
| |
Lysandros, the structural engineer, arrives on site to supervise the installation of nearly 40tonnes of equipment on the arena steel roof. |
| |
|
|
|
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
 |
|
| LEMESOS CARNIVAL |
| |
SKINOTECHNIKI has designed and constructed the centre piece of the carnival festivities in Lemesos
|
| |
|
|
|
|
|
|
| |
 |
|
| Limassol Christmas Decoration |
| |
For the 11th year running we won the pan-european competition and were awarded the design and construction of Lemesos City Christmas Decorations |
| |
|
|
|
|
|
|
|
|
|
|
|